    RECOMMENDED OPTION FOR JEFFERSON PERFORMING ARTS
     
    Our proposal to improve the building is designed to ensure Jefferson Performing Arts students have a facility that meets the educational needs of 21st century high school students.  When complete, Jefferson will be a smarter facility in many ways, including: 
    • ADA compliance throughout the facility, including an elevator to the second floor.
    • A secure and safe front entrance and pickup area for students, parents, staff, visitors and guests.
    • Installation of new efficient boiler.
    • Installation of new roof.
    • Increased safety with the building divided into secure zones with electronically activated door closers.

     Jefferson Diagram            

     
    OPTION C-2 CONSOLIDATE
    • Technology improvements.
    • Replace roof.
    • Replace boiler.
    • Safety and security improvements.

    SECURITY

    Modify facility to create obvious main entry, secure waiting area and ability to observe visitors approaching the building.  Subdivide the building into secure zones with electronically activated door closers.
     
    TECHNOLOGY
    Develop high-speed/high-volume fiber optic distribution to breakout spaces for projects, presentations and technology in each learning community, enhanced with robust wireless and hard-wired access points. 
     
    ENVIRONMENT 
    Install barn doors and garage doors with quality acoustical materials between learning areas and breakout areas for projects, presentations and technology.  Create small learning communities for teams of teachers and students that include traditional classroom as well as important support spaces for 1:1 tutoring, small groups, planning centers, storage, etc. 
      
    FACILITIES STRATEGIC PLAN
     
     Site Area:  42.64 acres  Remaining Deferred Maintenance
     Parking spaces560+  & Energy Project Costs $0 
     Building Square Footage  Rental/Lease/Sale Income:  None*All costs are projected based on industry
     Existing: 61,459  Current Enrollment:  0averages for building costs, sizes and land prices.
     New: 5,000  Future Peak Enrollment: 0Final project budgets will be developed 
     Total Project Cost:  $1,603,387*  Capacity:  1500during the design process for each site.
     Replacement Cost:  $5,484,369