    RECOMMENDED OPTION FOR HAWTHORNE ELEMENTARY SCHOOL 
     
    Our proposal to improve the building is designed to ensure Hawthorne Elementary School students have a facility that meets the educational needs of 21st century students.  When complete, Hawthorne will be a smarter school in many ways, including: 
    • ADA compliance throughout the facility, including an elevator to the gymnasium and second floor.
    • A visible, safe and secure main entrance.
    • A new cafeteria/multipurpose room for student dining, music classes and performances.
    • A highly functional library/media center.
    • Flexible collaboration spaces for students, teachers and parents.
    • Wireless Internet access for all classes and staff.
    • Additional classrooms to serve increased enrollment.
    • Increased safety, with the building divided into secure zones with electronically activated door closers.

           Hawthorne Floor 1 Hawthorne Floor 2

     
    OPTION E-2 EXPAND
    • Eliminate modular spaces.
    • Expand classroom space.
    • Add a new cafeteria/multipurpose space.
    • Improve library/media space.
    • ADA accessibility upgrades.
    • Boiler and heat distribution.
    • Technology improvements.
    • Safety and security improvements.

    SECURITY

    Modify facility to create obvious main entry, secure waiting area and ability to observe visitors approaching the building.  Subdivide the building into secure zones with electronically activated door closers.
     
    TECHNOLOGY
    Develop high-speed/high-volume fiber optic distribution to breakout spaces for projects, presentations and technology in each learning community, enhanced with robust wireless and hard-wired access points. 
     
    ENVIRONMENT 
    Install barn doors and garage doors with quality acoustical materials between learning areas and breakout areas for projects, presentations and technology.  Create small learning communities for teams of teachers and students that include traditional classroom as well as important support spaces for 1:1 tutoring, small groups, planning centers, storage, etc. 
      
    FACILITIES STRATEGIC PLAN
     
     Site Area:  5.42 acres  Remaining Deferred Maintenance
     Parking spaces100  & Energy Project Costs $0 
     Building Square Footage  Rental/Lease/Sale Income:  None*All costs are projected based on industry
     Existing: 50,045  Current Enrollment:  370averages for building costs, sizes and land prices.
     New: 7,000  Future Peak Enrollment:  434Final project budget will be developed during
     Total Project Cost:  $4,795,770*  Capacity:  450-500the design phase.
     Replacement Cost:  $12,838,108  .