    RECOMMENDED OPTION FOR CHIEF CHARLO ELEMENTARY SCHOOL 
     
    Our proposal to improve the building is designed to ensure Chief Charlo Elementary School students have a facility that meets the educational needs of 21st-century students.  When complete, Chief Charlo will be a smarter school in many ways, including: 
    • School entry and waiting area redesigned with clear lines of sight, enhancing school safety.
    • Existing classrooms connected through the installation of barn doors, promoting collaborative learning spaces for students and staff.
    • A schoolwide intercom system in all rooms improves communication and provides an effective means to relay important safety notices and other school information.

    Chief Charlo Floor Plan       

    OPTION L-1 LIGHT TOUCH           
    • Improve classroom space.
    • Install new school-wide intercom system.
    • Technology improvements.
    • Replace roof.
    • Security improvements.

    SECURITY

    Modify facility to create obvious main entry, secure waiting area and ability to observe visitors approaching the building.  Subdivide the building into secure zones with electronically activated door closers.
     
    TECHNOLOGY
    Develop high-speed/high-volume fiber optic distribution to breakout spaces for projects, presentations and technology in each learning community, enhanced with robust wireless and hard-wired access points. 
     
    ENVIRONMENT 
    Install barn doors and garage doors with quality acoustical materials between learning areas and breakout areas for projects, presentations and technology.  Create small learning communities for teams of teachers and students that include traditional classroom as well as important support spaces for 1:1 tutoring, small groups, planning centers, storage, etc. 
      
    FACILITIES STRATEGIC PLAN
     
     Site Area:  11.9 acres  Remaining Deferred Maintenance
     Parking Spaces70  & Energy Project Costs $0 
     Building Square Footage  Rental/Lease/Sale Income:  None*All costs are projected based on industry
     Existing: 61,150  Current Enrollment:  411averages for building costs, sizes and land prices.
     New: 0  Future Peak Enrollment:  404Final project budget will be developed during the
     Total Project Cost:  $769,337*  Capacity:  478design phase.
     Replacement Cost:  $15,880,000